4.8Km 2024-04-23
Bldg. Ga #106, 735 Michuhol-daero, Michuhol-gu, Incheon
-
4.8Km 2024-11-08
75 Gueup-ro, Jung-gu, Incheon
+82-32-713-0707
Seaside Park is a popular tourist attraction on Yeongjongdo Island, which is the size of Yeouido. Seaside Park's highlight attraction is Seaside Rail Bike, a 4-seater rail bike that runs on a 5.6-kilometer round-trip track along the coast. The open sea laid out right before one's eyes provides a pleasant experience by capturing the scenery from Wolmido Island to Incheondaegyo Bridge while on the rail bike. In addition, a landscape waterfall and various facilities offers even more fun while passengers pedal along the tracks.
5.0Km 2023-09-12
25 , Michuhol-daero 722beon-gil, Michuhol-gu, Incheon
+82-32-433-2500
U&I Hotel in Incheon is a 5-minute walk from Juan Station (Seoul Subway Line 1, Incheon Subway Line 2), making it convenient transportation-wise and popular with business travelers as well as vacationers. After a complete remodel in 2017, rooms are bright, clean and quiet, and boast king-size beds and air purifiers. There is a convenience store on-site, and a food alley nearby. Nearby destinations include Wolmido Island, Munhak Stadium, and Incheon Port. The Juan Sarang Hospital is next door.
5.4Km 2024-04-18
1F, Home Plus Ganseok Branch, 971, Gyeongwon-daero, Namdong-gu, Incheon
-
5.4Km 2024-04-22
971, Gyeongwon-daero, Namdong-gu, Incheon
-
5.5Km 2024-04-18
284, Gajeong-ro, Seo-gu, Incheon
-
5.6Km 2024-04-19
1017, Gyeongwon-daero, Bupyeong-gu, Incheon
-
6.1Km 2021-03-30
229-12, Cheongna, canal-ro, Seo-gu, Incheon
+82-32-567-0806
A place where they trim and sell high-quality meat directly. This BBQ restaurant is located in Seo-gu, Incheon. The representative menu is grilled Korean beef chuck flap tail.
6.1Km 2024-04-19
757, Gyeongwon-daero, Michuhol-gu, Incheon
-
6.1Km 2023-06-10
57 , Gukjehangman-daero 326beon-gil, Yeonsu-gu, Incheon
The Incheon Port International Passenger Terminal was created to develop Incheon Port into an internationally beautiful port for tourism by constructing an international passenger pier and terminal to resolve user inconvenience caused by dual (inner and coastal) operations and increase port operation efficiency. Construction began in December 2016 and was completed in June 2019, and operations began on June 15, 2020. It has a total floor area of 66,789.62 ㎡ (terminal building 65,421.15 ㎡, gate building 1,368.47 ㎡) and consists of five floors and a rooftop floor.